PROJECT HISTORY
Run history
Every genuine design run recorded for this project, the native IESVE / Revit / AutoCAD jobs, and earlier revisions and evidence — kept apart. Nothing here is re-run or reconstructed.
A design run is a database run record. Native jobs and evidence folders are listed separately and are never presented as runs. The WF1 run names (Run 3, Run 4) are shown only where the run's own records support them; hover a run label for the basis. Missing values are shown as "not recorded".
Design runs of this project (2)
| Run | Id | Date | Criteria | Changes | Status | Occupancy | Cooling (rooms) | Outdoor air | Plant cooling / heating | Open |
|---|---|---|---|---|---|---|---|---|---|---|
| Run 3 Baseline run — criteria revision 1 — RECORDED (verified evidence, not re-run) | c0fc0fd8 | 20 Oct 2026, 06:50 | R1 | none | succeeded | 98 persons | 47.4 kW | 1,183.4 l/s | 76.5 / 50.2 kW | Open run · Deliverables |
| Run 4 Change run — criteria revision 3 — RECORDED (verified evidence, not re-run) | 3773820c | 20 Oct 2026, 06:50 | R3 | 10 parameters | succeeded | 173 persons | 60.9 kW | 1,933.4 l/s | 106.1 / 56.8 kW | Open run · Deliverables |
Run detail — Run 4 — Change run — criteria revision 3 — RECORDED (verified evidence, not re-run)
Run 4 — the run's design model uses the Run 4 IESVE loads run WF1_CIBSE_GF_RUN4E. Run 3773820c-462e-4f76-931c-2f2ed3dda912 · reused evidence (recorded run, not re-run) · criteria R3 (fingerprint a0babb29) · model S3-P03C-CR003 (change on the P03A coordination candidate) (3e269275) · sheets P03C.
Rooms
12
WF1_CIBSE_GF_RUN4E
Occupancy
173 persons
Room cooling (design)
60.9 kW
Room heating (design)
33.1 kW
Outdoor air
1,933.4 l/s
FCUs
12
59.4 kW cooling
Plant (selected)
106.1 / 56.8 kW c / h
Networks / sections
17 / 120
Drawings, workbooks and schedules of this run BOQ for this run 3D review
Changed parameters (criteria R3)
Reason: Native IESVE loads applied from wf1-NATIVE-IESVE-RUN4-20261019-r3
- Room r01a — Open-plan office zone 1 — Occupancy: 17 → 34 person
- Room r01a — Open-plan office zone 1 — Lighting: 8 → 16 W/m²
- Room r01b — Open-plan office zone 2 — Occupancy: 17 → 34 person
- Room r01b — Open-plan office zone 2 — Lighting: 8 → 16 W/m²
- Room r01c — Open-plan office zone 3 — Occupancy: 17 → 34 person
- Room r01c — Open-plan office zone 3 — Lighting: 8 → 16 W/m²
- Room r02 — Meeting room 1 — Occupancy: 12 → 24 person
- Room r02 — Meeting room 1 — Lighting: 8 → 16 W/m²
- Room r03 — Meeting room 2 — Occupancy: 12 → 24 person
- Room r03 — Meeting room 2 — Lighting: 8 → 16 W/m²
Rooms: inputs and native loads (12)
| Room | Area m² | Occupancy | Lighting W/m² | Cooling W | Heating W | Outdoor air l/s | Loads source |
|---|---|---|---|---|---|---|---|
| r07 Accessible WC | 18.0 | 0 | 8 | 367 | 925 | 0.0 | IESVE native report p3 (local evidence, D-01) |
| r09 Mechanical plantroom | 108.0 | 0 | 0 | — | — | 0.0 | IESVE native report p4 (local evidence, D-01) |
| r02 Meeting room 1 | 36.0 | 24 | 16 | 6,150 | 2,074 | 250.8 | IESVE native report p5 (local evidence, D-01) |
| r03 Meeting room 2 | 36.0 | 24 | 16 | 5,904 | 1,616 | 250.8 | IESVE native report p6 (local evidence, D-01) |
| r01a Open-plan office zone 1 | 135.0 | 34 | 16 | 11,368 | 5,326 | 380.5 | IESVE native report p7 (local evidence, D-01) |
| r01b Open-plan office zone 2 | 135.0 | 34 | 16 | 11,218 | 5,316 | 380.5 | IESVE native report p8 (local evidence, D-01) |
| r01c Open-plan office zone 3 | 135.0 | 34 | 16 | 11,176 | 5,316 | 380.5 | IESVE native report p9 (local evidence, D-01) |
| r01d Open-plan office zone 4 | 135.0 | 17 | 8 | 7,904 | 5,327 | 210.5 | IESVE native report p10 (local evidence, D-01) |
| r04 Reception | 36.0 | 4 | 8 | 3,523 | 2,074 | 50.8 | IESVE native report p11 (local evidence, D-01) |
| r08 East lift lobby | 30.0 | 2 | 8 | 2,154 | 1,947 | 29.0 | IESVE native report p12 (local evidence, D-01) |
| r05 WC female | 30.0 | 0 | 8 | 587 | 1,664 | 0.0 | IESVE native report p13 (local evidence, D-01) |
| r06 WC male | 30.0 | 0 | 8 | 545 | 1,508 | 0.0 | IESVE native report p14 (local evidence, D-01) |
Native packages for this run
- autocad
wf1-NATIVE-DWG-RUN4-COORD-20261020-r2native verified (Run 4 baseline freeze document) - revit
wf1-NATIVE-REVIT-APS-MEP-20261019-1ce22c7enative verified · verdict PASS (Run 4 baseline freeze document) · Download native RVT (local only; SHA-25660c05c4e) - iesve
wf1-NATIVE-IESVE-RUN4-20261019-r3native verified (Run 4 baseline freeze document)
Stage 4 deliverable sets
Stage 4 sets registered for Run 4; all PROPOSED unless stated.
- Native Revit GA v10 — 10 sheets (DWG, PDF, preview) with sheet-by-sheet verification native executed not accepted P07
- Native Revit GA v10 — work item d8a57d57 on the accepted model 1ce22c7e (run 117 / 117) native executed not accepted P07
- Native Revit GA v9 — work item 35005cf7 (run 116 / 117; reviewed) superseded P07
- Native Revit GA v8 — work item 88eb7786 (run 117 / 117; reviewed) superseded P07
- Native Revit GA v7 — 10 sheets (DWG, PDF, preview) with sheet-by-sheet verification superseded P07
- Native Revit GA v7 — work item ad1b95d3 on the accepted model 1ce22c7e (run 117 / 117) superseded P07
- Native Revit GA v6 — 10 sheets (DWG, PDF, preview) with sheet-by-sheet verification superseded P07
- Native Revit GA v6 — work item 1f03760e on the accepted model 1ce22c7e (run PARTIAL 106 / 107) superseded P07
- Schematics and details set r4 (M-5211..5214, M-5611..5613, M-5911) — drawing-quality gate proposed P07
- Native AutoCAD DWGs of schematic set r4 — APS AutoCAD batch e535ebae (re-accepted -r2) native verified P07
- Offline GA set r3 (condensate M-5121 / M-5122 current at P07) — drawing-quality gate proposed P07
- Schematics and details set r3 (M-5211..5214, M-5611..5613, M-5911) — reconciliation corrections superseded P07
- GA set r2 — ventilation, four-pipe and condensate part plans (M-5011/12, M-5111/12, M-5121/22) superseded P07
- Final calculation package and Appendix A equipment workbook (P07) proposed P07
- Stage 4 BOQ — Run 3 vs Run 4 from native take-offs (ILLUSTRATIVE rates) proposed P07
- Native Revit GA v5 — FAILED (logger vocabulary; no sheets) native executed not accepted P07
- Schematic set r2 — corrected DXF package (HIDDEN linetype defined), native package ready superseded P07
- Native AutoCAD DWGs of the schematic set r3 — APS AutoCAD Automation (cloud), 8 sheets superseded P07
- Native AutoCAD conversion of the schematic set — FAILED (43 / 91) native executed not accepted P07
- Native Revit GA v4 — 10 sheets, DWG + PDF (work item c5614cb2) native executed not accepted P07
- Native Revit GA v4 — sheet previews (recovered from the native PDF) superseded P07
- GA set — ventilation, four-pipe and condensate part plans (M-5011/12, M-5111/12, M-5121/22) superseded P07
- Schematics and details set (M-5211..5214, M-5611..5613, M-5911) superseded P07
- Final calculation package (P08) and Appendix A equipment workbook superseded P08
- Stage 4 BOQ — Run 3 vs Run 4 from native take-offs (ILLUSTRATIVE rates) superseded P07
- GA samples M-5011 / M-5112 (1:50 part plans, r2 after owner review) superseded P07
- GA samples M-5011 / M-5112 (r1) superseded P07
- Coordinated AutoCAD drawing set P05 (16 sheets) accepted technical P05
- Ventilation schematic M-5211 from the engineering graph superseded P07
- CHW M-5212 / LTHW M-5213 schematics from the hydronic graph superseded P07
- Schematics, details and legend in the v3 frame superseded P07
- Representative workbooks: data sheets (E), calculation pages (F), BOQ Section B (G) superseded P07
- Native Revit MEP model 1ce22c7e (accepted Run 4) native verified P01 (native sheets)
- Native Revit GA sheets (HexantaGa v3 work item 4529cd24) superseded P07
- Native Revit GA sheet previews (recovered from the native PDF) superseded P07
Reviews and comments
development identities, unverified — records, not professional sign-off. by time: the markup records hold no run id, so each is shown under the latest run created before it.
- Design change COORD-P03C (P03C -> P03D, raised against this run's model): Re-coordinate OA:oa-m2, OA:oa-m3, OA:oa-m4, OA:oa-m5, OA:oa-m6, GEX:gx-m1, GEX:gx-m2, GEX:gx-m3, GEX:gx-m5, GEX:gx-ws: resized duct outside its coordinated envelope proposed raised by hexanta-pipeline 20 Oct 2026, 06:50
- Design change XX-RUN4-DC-01 (P03B -> P03C, results in this run's model): XX-TEST Run 4 owner change: occupancy x2 and lighting x2 in 5 rooms (criteria R04) approved raised by dev-unverified:XX-TEST designer 20 Oct 2026, 06:51 · approved by dev-unverified:XX-TEST engineer 20 Oct 2026, 06:51
- Markup mk-mvjeoemt-1: close by dev-unverified:E2E v10 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:36
- Markup mk-mvjeoemt-1: resolve by dev-unverified:E2E v10 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:36
- Markup mk-mvjeoemt-1: respond by dev-unverified:E2E v10 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:36
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:36
- Markup mk-mvjebzqm-1: close by dev-unverified:E2E v10 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:26
- Markup mk-mvjebzqm-1: resolve by dev-unverified:E2E v10 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:26
- Markup mk-mvjebzqm-1: respond by dev-unverified:E2E v10 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:26
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:26
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:21
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 22 Oct 2026, 10:15
- Markup mk-mvin01tb-1: close by dev-unverified:E2E v11 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 21:41
- Markup mk-mvin01tb-1: resolve by dev-unverified:E2E v11 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 21:41
- Markup mk-mvin01tb-1: respond by dev-unverified:E2E v11 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 21:41
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 21:41
- Markup mk-mvik5f70-1: close by dev-unverified:E2E v10-r3 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:21
- Markup mk-mvik5f70-1: resolve by dev-unverified:E2E v10-r3 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:21
- Markup mk-mvik5f70-1: respond by dev-unverified:E2E v10-r3 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:21
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:21
- Markup mk-mvik0ysc-1: close by dev-unverified:E2E v10-r2 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:18
- Markup mk-mvik0ysc-1: resolve by dev-unverified:E2E v10-r2 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:18
- Markup mk-mvik0ysc-1: respond by dev-unverified:E2E v10-r2 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:18
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:18
- Markup mk-mvijwon6-1: close by dev-unverified:E2E v10 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:15
- Markup mk-mvijwon6-1: resolve by dev-unverified:E2E v10 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:14
- Markup mk-mvijwon6-1: respond by dev-unverified:E2E v10 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:14
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 20:14
- Markup mk-mvibosv0-1: close by dev-unverified:E2E v9 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 16:24
- Markup mk-mvibosv0-1: resolve by dev-unverified:E2E v9 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 16:24
- Markup mk-mvibosv0-1: respond by dev-unverified:E2E v9 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 16:24
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 16:24
- Markup mk-mvhxrrc7-1: close by dev-unverified:E2E v8 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 09:55
- Markup mk-mvhxrrc7-1: resolve by dev-unverified:E2E v8 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 09:55
- Markup mk-mvhxrrc7-1: respond by dev-unverified:E2E v8 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 09:55
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 09:55
- Markup mk-mvhwa2j2-1: close by dev-unverified:E2E v7 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 09:13
- Markup mk-mvhwa2j2-1: resolve by dev-unverified:E2E v7 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 09:13
- Markup mk-mvhwa2j2-1: respond by dev-unverified:E2E v7 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 09:13
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 09:13
- Markup mk-mvhseuvf-1: close by dev-unverified:E2E v6 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 07:25
- Markup mk-mvhseuvf-1: resolve by dev-unverified:E2E v6 Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 07:25
- Markup mk-mvhseuvf-1: respond by dev-unverified:E2E v6 Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 07:25
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 07:25
- Markup mk-mvhp0to0-1: close by dev-unverified:E2E Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 05:50
- Markup mk-mvhp0to0-1: resolve by dev-unverified:E2E Reviewer A (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 05:50
- Markup mk-mvhp0to0-1: respond by dev-unverified:E2E Designer B (development identity) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 05:50
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 05:50
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 05:49
- Review started on M-5011 (P07) human:dev-unverified:XX-TEST reviewer (review stack) · 21 Oct 2026, 05:48
- Markup XX-REVIEW-replay-note close by dev-unverified:XX-TEST engineer human:dev-unverified:XX-TEST engineer · 20 Oct 2026, 06:51
- Markup XX-REVIEW-replay-note respond by dev-unverified:XX-TEST designer human:dev-unverified:XX-TEST designer · 20 Oct 2026, 06:51
- Marked-up WF1-HXA-ZZ-GF-DR-M-5001.pdf uploaded: 1 markup(s) human:dev-unverified:XX-TEST reviewer · 20 Oct 2026, 06:51
- Review sheet WF1-HXA-ZZ-GF-DR-M-5001.pdf issued for markup human:dev-unverified:XX-TEST operator (review replay) · 20 Oct 2026, 06:51
Compare two runs (before / after)
The change-impact check (PASS / FAIL with traced drawing changes) and comparisons of evidence-held design revisions are on the Changes page; the priced comparison is on BOQ & cost.
Original WF1 project runs — read-only snapshot (8)
Runs of the original WF1 project in another database, as held in the manifest-verified history snapshot (read-only); this application does not connect to that database and these runs are not runs of this project. Source: snapshot wf1-PROJECT-HISTORY-20261020-r2 (manifest-verified).
| Run | Id | Project | Date | Criteria | Model revision | Status | Evidence |
|---|---|---|---|---|---|---|---|
| Recorded evidence: S3-P03 frozen package | 13bfdc46 | Workflow 1 London office — ground floor (b0511a88, original WF1 database (55433)) | 16 Oct 2026, 18:46 | R1 | S3-P03 (provisional design-development candidate) | succeeded | wf1-STAGE3-P03-20261016 |
| Recorded evidence: CS-01 change scenario (r02 occupancy 12 -> 16) | ef31282d | Workflow 1 London office — ground floor (b0511a88, original WF1 database (55433)) | 16 Oct 2026, 18:46 | R1 | S3-P03A-CS01 (change scenario on the P03A coordination candidate) | succeeded | wf1-CHANGE-CS01-20261016 |
| Recorded evidence: S3-P03A frozen package | d55234f0 | Workflow 1 London office — ground floor (b0511a88, original WF1 database (55433)) | 16 Oct 2026, 18:46 | R1 | S3-P03A (provisional coordination candidate) | succeeded | wf1-STAGE3-P03A-COORD-20261016 |
| Baseline run — criteria revision 1 | b1116d42 | Workflow 1 London office — ground floor (b0511a88, original WF1 database (55433)) | 16 Oct 2026, 18:48 | R1 | S3-P03A (provisional coordination candidate) | succeeded | not recorded |
| Baseline run — criteria revision 1 | 51902593 | Workflow 1 London office — ground floor (b0511a88, original WF1 database (55433)) | 16 Oct 2026, 22:40 | R1 | S3-P03A (provisional coordination candidate) | succeeded | not recorded |
| P04 consultant presentation, plant selection, takeoff and spec links | 47668d26 | Workflow 1 London office — ground floor (b0511a88, original WF1 database (55433)) | 17 Oct 2026, 18:42 | R1 | S3-P03B (provisional coordination candidate, regenerated) | succeeded | not recorded |
| P03C: plantroom elevations M-5302, plant scenario matrix, acceptance matrix | 4b8d3859 | Workflow 1 London office — ground floor (b0511a88, original WF1 database (55433)) | 17 Oct 2026, 20:14 | R1 | S3-P03C (provisional coordination candidate, regenerated) | succeeded | not recorded |
| P03D: final WF1 acceptance candidate (P03C + Windows CAD font) | 73ef2b3a | Workflow 1 London office — ground floor (b0511a88, original WF1 database (55433)) | 17 Oct 2026, 21:12 | R1 | S3-P03D (provisional coordination candidate, regenerated) | succeeded | not recorded |
Native jobs (132) — not design runs
Native executions (IESVE, APS Revit, AutoCAD) are not design runs. Verdicts are technical (native) results, not engineering approval.
AutoCAD (native DWG) (32)
| Job | Date | Work item | Verdict | Evidence |
|---|---|---|---|---|
| 2026-10-12_307ace8 | 12 Oct 2026, 01:44 | not recorded | not recorded | 2026-10-12_307ace8 |
| 2026-10-12_307ace8-api | 12 Oct 2026, 02:03 | not recorded | not recorded | 2026-10-12_307ace8-api |
| 2026-10-12_307ace8-final | 12 Oct 2026, 02:18 | not recorded | not recorded | 2026-10-12_307ace8-final |
| workflow1-v4 | 14 Oct 2026, 03:56 | not recorded | not recorded | workflow1-v4 |
| workflow1-v5 | 14 Oct 2026, 04:00 | not recorded | not recorded | workflow1-v5 |
| workflow1-v5-retry1 | 14 Oct 2026, 04:32 | not recorded | not recorded | workflow1-v5-retry1 |
| workflow1-v5-retry2 | 14 Oct 2026, 05:05 | not recorded | not recorded | workflow1-v5-retry2 |
| workflow1-v6 | 14 Oct 2026, 05:54 | not recorded | not recorded | workflow1-v6 |
| workflow1-v8b | 14 Oct 2026, 05:56 | not recorded | not recorded | workflow1-v8b |
| workflow1-v8a | 14 Oct 2026, 06:12 | not recorded | not recorded | workflow1-v8a |
| 2026-10-14_v9-v3 | 14 Oct 2026, 07:13 | not recorded | not recorded | 2026-10-14_v9-v3 |
| 2026-10-14_v9-hvac | 14 Oct 2026, 07:16 | not recorded | not recorded | 2026-10-14_v9-hvac |
| 2026-10-14_v9-v8 | 14 Oct 2026, 07:35 | not recorded | not recorded | 2026-10-14_v9-v8 |
| workflow1-v8-closure | 14 Oct 2026, 07:35 | not recorded | not recorded | workflow1-v8-closure |
| wf1-NATIVE-DWG-20261017 | 16 Oct 2026, 23:55 | not recorded | native_verified | wf1-NATIVE-DWG-20261017 |
| Native job 07984b1d: Queued for the Windows worker | 17 Oct 2026, 19:21 | 07984b1d | not recorded | not recorded |
| wf1-NATIVE-DWG-20261017-J054f6258 | 17 Oct 2026, 20:56 | not recorded | native_verified | wf1-NATIVE-DWG-20261017-J054f6258 |
| wf1-NATIVE-DWG-20261017-J6a1128e2 | 17 Oct 2026, 21:52 | not recorded | native_verified | wf1-NATIVE-DWG-20261017-J6a1128e2 |
| Native job 054f6258: Queued for the Windows worker | 17 Oct 2026, 20:57 | 054f6258 | not recorded | not recorded |
| Native job 6a1128e2: Queued for the Windows worker | 17 Oct 2026, 21:52 | 6a1128e2 | not recorded | not recorded |
| Native AutoCAD DWG for the Run 3 r2 drawings (XX-TEST): PASS (2026-10-19) | 19 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-DWG-RUN3-20261019 |
| Native AutoCAD DWG for the FINAL Run 3 r3 drawings (XX-TEST): PASS (2026-10-19) | 19 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-DWG-RUN3-20261019-r3 |
| Native AutoCAD DWG for the Run 3 r5 drawings (XX-TEST): PASS (2026-10-19) · frozen for Run 3 | 19 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-DWG-RUN3-20261019-r5 |
| Native AutoCAD DWG for the Run 4 change-run drawings (XX-TEST, P03C): PASS (2026-10-19) | 19 Oct 2026, 00:00 | not recorded | PASS | wf1-NATIVE-DWG-RUN4-20261019 |
| Native AutoCAD DWG for the Run 4 r3 change-run drawings (XX-TEST, P03C): PASS (2026-10-19, r2) | 19 Oct 2026, 00:00 | not recorded | PASS | wf1-NATIVE-DWG-RUN4-20261019-r2 |
| Native AutoCAD DWG for the Run 4 coordinated-route drawing set (D3, P04, routes P03E r11-r7): PASS (2026-10-19) | 19 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-DWG-RUN4-COORD-20261019-r11-r7 |
| Native AutoCAD DWG for the Run 4 coordinated-route drawing set r2 (D3, P05, rise / drop marks): PASS (2026-10-20) · frozen for Run 4 | 20 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-DWG-RUN4-COORD-20261020-r2 |
| wf1-NATIVE-DWG-RUN4-STAGE4-SCHEMATIC-SET-20261021 | 21 Oct 2026, 05:37 | not recorded | failed | wf1-NATIVE-DWG-RUN4-STAGE4-SCHEMATIC-SET-20261021 |
| wf1-NATIVE-DWG-APS-20261021-bb84fff3 superseded | 21 Oct 2026, 09:40 | not recorded | failed | wf1-NATIVE-DWG-APS-20261021-bb84fff3 |
| wf1-NATIVE-DWG-APS-20261021-bb84fff3-r2 | 21 Oct 2026, 09:42 | not recorded | native_verified | wf1-NATIVE-DWG-APS-20261021-bb84fff3-r2 |
| wf1-NATIVE-DWG-APS-20261021-e535ebae superseded | 21 Oct 2026, 21:12 | not recorded | failed | wf1-NATIVE-DWG-APS-20261021-e535ebae |
| wf1-NATIVE-DWG-APS-20261021-e535ebae-r2 | 21 Oct 2026, 21:14 | not recorded | native_verified | wf1-NATIVE-DWG-APS-20261021-e535ebae-r2 |
IESVE (native loads) (12)
| Job | Date | Work item | Verdict | Evidence |
|---|---|---|---|---|
| iesve-wf1-20261014T175825Z-interim-p3a | 14 Oct 2026, 17:58 | not recorded | not recorded | iesve-wf1-20261014T175825Z-interim-p3a |
| iesve-wf1-20261014T175825Z-preserved | 14 Oct 2026, 17:58 | not recorded | FAIL | iesve-wf1-20261014T175825Z-preserved |
| iesve-wf1-CIBSE-GF-Rev02-H02-C02-20261015 · frozen for Run 3 | 15 Oct 2026, 00:00 | not recorded | PASS | iesve-wf1-CIBSE-GF-Rev02-H02-C02-20261015 |
| iesve-wf1-CIBSE-WF1_CIBSE_SC01-20261015T0440Z | 15 Oct 2026, 04:40 | not recorded | FAIL | iesve-wf1-CIBSE-WF1_CIBSE_SC01-20261015T0440Z |
| iesve-wf1-CIBSE-WF1_CIBSE_H01-20261015T0548Z | 15 Oct 2026, 05:48 | not recorded | not recorded | iesve-wf1-CIBSE-WF1_CIBSE_H01-20261015T0548Z |
| iesve-wf1-CIBSE-WF1_CIBSE_SC02-20261015T0600Z | 15 Oct 2026, 06:00 | not recorded | NOT ENGINEER REVIEWED | iesve-wf1-CIBSE-WF1_CIBSE_SC02-20261015T0600Z |
| WF1 CS-01 native IESVE recalculation (r02 Meeting room 1, 12 → 16 people) — BLOCKED (2026-10-17) | 17 Oct 2026, 01:09 | not recorded | blocked | iesve-wf1-CIBSE-GF-CS01-20261017 |
| WF1 CS-01 native IESVE run 2 (r02 Meeting room 1, 12 -> 16 people): PAUSED (2026-10-17) | 17 Oct 2026, 07:17 | not recorded | blocked | iesve-wf1-CIBSE-GF-CS01-20261017-run2 |
| WF1 Run 4: native IESVE heating + cooling for the owner's change (2026-10-19): **FAIL (occupancy did not reach the calculation)** | 19 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-IESVE-RUN4-20261019 |
| WF1 Run 4 r2: native IESVE heating + cooling for the owner's change (2026-10-19): **PASS** · frozen for Run 4 | 19 Oct 2026, 00:00 | not recorded | PASS | wf1-NATIVE-IESVE-RUN4-20261019-r2 |
| Native IESVE through VE's script runner: XX-TEST CIBSE loads (2026-10-19) | 19 Oct 2026, 00:00 | not recorded | IN PROGRESS | wf1-NATIVE-IESVE-SCRIPT-RUNNER-20261019 |
| wf1-NATIVE-IESVE-RUN4-20261019-r3 · frozen for Run 4 | 19 Oct 2026, 08:52 | not recorded | native_verified | wf1-NATIVE-IESVE-RUN4-20261019-r3 |
not recorded (1)
| Job | Date | Work item | Verdict | Evidence |
|---|---|---|---|---|
| Native Windows environment reuse check (2026-10-18) | 18 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-WINDOWS-REUSE-20261018 |
APS Revit (Design Automation) (87)
| Job | Date | Work item | Verdict | Evidence |
|---|---|---|---|---|
| APS input package bootstrap-inputs-20261018-r6b | 18 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package bootstrap-inputs-20261018-r8u | 18 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package bootstrap-inputs-20261018-r9u | 18 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261018-r2 | 18 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261018-r2 |
| wf1-NATIVE-REVIT-APS-20261018-a456d2c4 | 18 Oct 2026, 00:22 | 3b7a3a95 | failed | wf1-NATIVE-REVIT-APS-20261018-a456d2c4 |
| wf1-NATIVE-REVIT-APS-20261018-a456d2c4-r2 | 18 Oct 2026, 00:22 | 3b7a3a95 | failed | wf1-NATIVE-REVIT-APS-20261018-a456d2c4-r2 |
| wf1-NATIVE-REVIT-APS-20261018-a456d2c4-r3 | 18 Oct 2026, 00:22 | 3b7a3a95 | native_verified | wf1-NATIVE-REVIT-APS-20261018-a456d2c4-r3 |
| wf1-NATIVE-REVIT-APS-PROBE-20261018-960a52b3 | 18 Oct 2026, 01:08 | 075caf94 | probe_returned | wf1-NATIVE-REVIT-APS-PROBE-20261018-960a52b3 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-5d92478d | 18 Oct 2026, 03:36 | 2207ddd9 | work item cancelled | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-5d92478d |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-b7839784 | 18 Oct 2026, 08:03 | 730418dd | work item cancelled | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-b7839784 |
| wf1-NATIVE-REVIT-APS-DIAG-20261018-362e6b1c | 18 Oct 2026, 09:14 | 5a33ceab | work item success | wf1-NATIVE-REVIT-APS-DIAG-20261018-362e6b1c |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-ec4ca782 | 18 Oct 2026, 09:24 | b4fcb187 | work item success | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-ec4ca782 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-aa41600b | 18 Oct 2026, 09:33 | c65b81f5 | work item success | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-aa41600b |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-58aa23a9 | 18 Oct 2026, 18:18 | dbca8b5c | work item success | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-58aa23a9 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-7ffa541a | 18 Oct 2026, 19:27 | 91d6ce97 | work item success | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-7ffa541a |
| APS input package bootstrap-inputs-20261019-r10u | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package bootstrap-inputs-20261019-run4-r11 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package bootstrap-inputs-20261019-run4-r11-r3 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package bootstrap-inputs-20261019-run4-r11-r5-min | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package bootstrap-inputs-20261019-run4-r11-r5-min2 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-r10-r2 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run3-r3 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run3-r4 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run3-r5 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run3-r6 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11-r2 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11-r3 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11-r4 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11-r4b | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11-r5 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11-r5-final | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11-r6 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261019-run4-r11-r7 | 19 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-927f266c · frozen for Run 3 | 19 Oct 2026, 00:36 | 935a62df | work item success | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-927f266c |
| wf1-NATIVE-REVIT-APS-MEP-20261019-efa1e0d7 | 19 Oct 2026, 01:07 | 949e2fdd | work item failedInstructions | wf1-NATIVE-REVIT-APS-MEP-20261019-efa1e0d7 |
| wf1-NATIVE-REVIT-APS-MEP-20261019-ac55c5c8 | 19 Oct 2026, 06:58 | 4bff2a9b | work item failedInstructions | wf1-NATIVE-REVIT-APS-MEP-20261019-ac55c5c8 |
| wf1-NATIVE-REVIT-APS-MEP-20261019-ef0b1822 | 19 Oct 2026, 07:19 | 686e0c0a | work item failedInstructions | wf1-NATIVE-REVIT-APS-MEP-20261019-ef0b1822 |
| wf1-NATIVE-REVIT-APS-MEP-20261019-ec44a285 | 19 Oct 2026, 08:06 | 74e84655 | work item failedInstructions | wf1-NATIVE-REVIT-APS-MEP-20261019-ec44a285 |
| wf1-NATIVE-REVIT-APS-MEP-20261019-c2a4e030 | 19 Oct 2026, 09:02 | e4466bc9 | PARTIAL | wf1-NATIVE-REVIT-APS-MEP-20261019-c2a4e030 |
| wf1-NATIVE-REVIT-APS-MEP-20261019-e04562ea | 19 Oct 2026, 10:02 | 300f6649 | PARTIAL | wf1-NATIVE-REVIT-APS-MEP-20261019-e04562ea |
| wf1-NATIVE-REVIT-APS-MEP-20261019-e963993a · frozen for Run 3 | 19 Oct 2026, 14:26 | 48e4bb8e | PARTIAL | wf1-NATIVE-REVIT-APS-MEP-20261019-e963993a |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-251a3330 · frozen for Run 4 | 19 Oct 2026, 20:46 | 710d96c5 | work item success | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-251a3330 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-b537f720 | 19 Oct 2026, 21:20 | 6717c070 | work item success | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-b537f720 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-381f2851 · frozen for Run 4 | 19 Oct 2026, 21:26 | 7c52fb75 | work item success | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-381f2851 |
| wf1-NATIVE-REVIT-APS-MEP-20261019-67a01b14 | 19 Oct 2026, 21:41 | afb1fed9 | PARTIAL | wf1-NATIVE-REVIT-APS-MEP-20261019-67a01b14 |
| wf1-NATIVE-REVIT-APS-MEP-20261019-1ce22c7e · frozen for Run 4 | 19 Oct 2026, 22:22 | 0e6a35f8 | PASS | wf1-NATIVE-REVIT-APS-MEP-20261019-1ce22c7e |
| APS input package bootstrap-inputs-20261020-run4-r14 | 20 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package bootstrap-inputs-20261020-run4-r15 | 20 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package ga-inputs-20261020 | 20 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261020-run4-r12 | 20 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261020-run4-r14 | 20 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| APS input package mep-inputs-20261020-run4-r15 | 20 Oct 2026, 00:00 | not recorded | not recorded | not recorded |
| Native Revit GA sheet previews — work item 4529cd24 (run 449f8d8a), HexantaGa v3 superseded | 20 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261020-449f8d8a-PREVIEWS |
| Native Revit GA sheet previews — work item 4529cd24 (run 449f8d8a), HexantaGa v3 | 20 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261020-449f8d8a-PREVIEWS-r2 |
| wf1-NATIVE-REVIT-APS-GA-20261020-f83443de | 20 Oct 2026, 20:09 | 3c92f1fc | FAIL | wf1-NATIVE-REVIT-APS-GA-20261020-f83443de |
| wf1-NATIVE-REVIT-APS-GA-20261020-253b711d | 20 Oct 2026, 20:20 | da397054 | FAIL | wf1-NATIVE-REVIT-APS-GA-20261020-253b711d |
| wf1-NATIVE-REVIT-APS-GA-20261020-449f8d8a | 20 Oct 2026, 20:30 | 4529cd24 | FAIL | wf1-NATIVE-REVIT-APS-GA-20261020-449f8d8a |
| wf1-NATIVE-REVIT-APS-GA-20261021-361382f6-SHEETS | 21 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261021-361382f6-SHEETS |
| wf1-NATIVE-REVIT-APS-GA-20261021-435e30dc-SHEETS-r2 | 21 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261021-435e30dc-SHEETS-r2 |
| wf1-NATIVE-REVIT-APS-GA-20261021-56847de3-SHEETS | 21 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261021-56847de3-SHEETS |
| wf1-NATIVE-REVIT-APS-GA-20261021-a89cd613-SHEETS | 21 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261021-a89cd613-SHEETS |
| Native Revit GA v4 sheet previews — work item run c5614cb2 (HexantaGa v4) | 21 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261021-c5614cb2-PREVIEWS |
| wf1-NATIVE-REVIT-APS-GA-20261021-fc372ee3-SHEETS | 21 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261021-fc372ee3-SHEETS |
| wf1-NATIVE-REVIT-APS-GEOM-20261021-f05a5d66 | 21 Oct 2026, 04:45 | 7c5e3cf2 | PARTIAL | wf1-NATIVE-REVIT-APS-GEOM-20261021-f05a5d66 |
| wf1-NATIVE-REVIT-APS-GA-20261021-c5614cb2 | 21 Oct 2026, 04:47 | 7703bc0a | PARTIAL | wf1-NATIVE-REVIT-APS-GA-20261021-c5614cb2 |
| wf1-NATIVE-REVIT-APS-GA-20261021-92cc029e | 21 Oct 2026, 06:37 | 2c5f9e4b | FAIL | wf1-NATIVE-REVIT-APS-GA-20261021-92cc029e |
| wf1-NATIVE-REVIT-APS-GA-20261021-435e30dc | 21 Oct 2026, 15:28 | 1f03760e | PARTIAL | wf1-NATIVE-REVIT-APS-GA-20261021-435e30dc |
| wf1-NATIVE-REVIT-APS-GA-20261021-361382f6 | 21 Oct 2026, 20:04 | ad1b95d3 | PASS | wf1-NATIVE-REVIT-APS-GA-20261021-361382f6 |
| wf1-NATIVE-REVIT-APS-GA-20261021-56847de3 | 21 Oct 2026, 21:10 | 88eb7786 | PASS | wf1-NATIVE-REVIT-APS-GA-20261021-56847de3 |
| wf1-NATIVE-REVIT-APS-GA-20261021-a89cd613 | 21 Oct 2026, 21:25 | 35005cf7 | PARTIAL | wf1-NATIVE-REVIT-APS-GA-20261021-a89cd613 |
| wf1-NATIVE-REVIT-APS-GA-20261021-fc372ee3 | 21 Oct 2026, 21:34 | d8a57d57 | PASS | wf1-NATIVE-REVIT-APS-GA-20261021-fc372ee3 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261022 superseded | 22 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261022 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261022-r2 | 22 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261022-r2 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261022-r3 superseded | 22 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261022-r3 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261022-r4 | 22 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-BOOTSTRAP-PRESUBMIT-20261022-r4 |
| wf1-NATIVE-REVIT-APS-GA-20261022-14eb2f88-SHEETS superseded | 22 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261022-14eb2f88-SHEETS |
| wf1-NATIVE-REVIT-APS-GA-20261022-14eb2f88-SHEETS-r2 | 22 Oct 2026, 00:00 | not recorded | not recorded | wf1-NATIVE-REVIT-APS-GA-20261022-14eb2f88-SHEETS-r2 |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261022-094b9042 | 22 Oct 2026, 07:19 | 3481f531 | not recorded | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261022-094b9042 |
| wf1-NATIVE-REVIT-APS-MEP-20261022-48aa7a18 superseded | 22 Oct 2026, 07:38 | 89cc74c7 | PASS | wf1-NATIVE-REVIT-APS-MEP-20261022-48aa7a18 |
| wf1-NATIVE-REVIT-APS-GEOM-20261022-05ef5dbc | 22 Oct 2026, 08:40 | 722b171e | PARTIAL | wf1-NATIVE-REVIT-APS-GEOM-20261022-05ef5dbc |
| wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261022-f08b8867 | 22 Oct 2026, 09:38 | b5f41403 | not recorded | wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261022-f08b8867 |
| wf1-NATIVE-REVIT-APS-MEP-20261022-a46447da | 22 Oct 2026, 09:42 | bd92ca8d | PARTIAL | wf1-NATIVE-REVIT-APS-MEP-20261022-a46447da |
| wf1-NATIVE-REVIT-APS-MEP-20261022-d427192e | 22 Oct 2026, 09:50 | 58b85165 | PASS | wf1-NATIVE-REVIT-APS-MEP-20261022-d427192e |
| wf1-NATIVE-REVIT-APS-GEOM-20261022-3ac55842 | 22 Oct 2026, 10:01 | cb6076cd | PARTIAL | wf1-NATIVE-REVIT-APS-GEOM-20261022-3ac55842 |
| wf1-NATIVE-REVIT-APS-GA-20261022-7402a694 | 22 Oct 2026, 10:01 | fb83696f | PARTIAL | wf1-NATIVE-REVIT-APS-GA-20261022-7402a694 |
| wf1-NATIVE-REVIT-APS-GA-20261022-14eb2f88 | 22 Oct 2026, 10:06 | a5904a93 | PASS | wf1-NATIVE-REVIT-APS-GA-20261022-14eb2f88 |
Earlier revisions and historical evidence
Earlier revisions and evidence folders, typed by class; an evidence folder is never a design run. The full typed timeline is on the Changes page. Open the full timeline.
Development / test executions (40)
- wf1-CONSOLIDATION-20261016 16 Oct 2026, 00:00 · recorded
- wf1-PRODUCT-20261016 16 Oct 2026, 00:00 · recorded
- wf1-RC-20261016 16 Oct 2026, 00:00 · recorded
- wf1-WINDOWS-SEQUENCE-20261016 16 Oct 2026, 00:00 · recorded
- wf1-FINAL-ACCEPTANCE-20261017 17 Oct 2026, 00:00 · recorded
- wf1-FINAL-ACCEPTANCE-20261017-r2 17 Oct 2026, 00:00 · r2 · recorded
- wf1-FINAL-ACCEPTANCE-20261017-r3 17 Oct 2026, 00:00 · r3 · recorded
- wf1-APS-CHECK-20261018 18 Oct 2026, 00:00 · recorded
- wf1-DELIVERABLE-QA-20261018 18 Oct 2026, 00:00 · recorded
- WF1 deliverable reconciliation 18 Oct 2026, 00:00 · recorded
- WF1 deliverable reconciliation 18 Oct 2026, 00:00 · r6 · superseded · superseded
- WF1 deliverable reconciliation 18 Oct 2026, 00:00 · r6-r2 · recorded
- wf1-REVIEW-OVERLAY-XX-TEST-20261018 18 Oct 2026, 00:00 · recorded
- XX-TEST: PDF review markup, clause register and design-change register (2026-10-18) 18 Oct 2026, 00:00 · recorded
- wf1-RUN3-PACKAGE-20261018 18 Oct 2026, 00:00 · RUN3 · recorded
- wf1-RUN3-PACKAGE-20261018-r6-PRELIM 18 Oct 2026, 00:00 · r6 · superseded · superseded
- wf1-RUN3-PACKAGE-20261018-r6-r2 18 Oct 2026, 00:00 · r6-r2 · recorded
- wf1-UI-SMOKE-20261018 18 Oct 2026, 00:00 · recorded
- WF1 P03E workbooks - real spreadsheet engine recalculation cross-check (2026-10-18) 18 Oct 2026, 00:00 · recorded
- Run 3 office dry run (XX-TEST, offline) 18 Oct 2026, 18:40 · RUN3 · recorded
- Run 3 — synthetic XX-TEST London office, prepared and driven through the UI 18 Oct 2026, 20:55 · RUN3 · recorded
- wf1-CHANGE-IMPACT-DEMO-20261019 19 Oct 2026, 00:00 · recorded
- Run 3 — XX-TEST London office, prepared and driven through the UI 19 Oct 2026, 00:00 · RUN3 · recorded
- WF1 Run 3 (London office) workbooks - real spreadsheet engine recalculation cross-check (2026-10-19) 19 Oct 2026, 00:00 · RUN3 · recorded
- wf1-RUN4-R11-R7-XLSX-RECALC-20261019 19 Oct 2026, 00:00 · RUN4 · recorded
- Run 3 — XX-TEST London office, prepared and driven through the UI 19 Oct 2026, 00:02 · r2 · recorded
- Run 3 — XX-TEST London office, prepared and driven through the UI 19 Oct 2026, 01:55 · r3 · recorded
- Run 3 — XX-TEST London office, prepared and driven through the UI 19 Oct 2026, 14:55 · r4 · recorded
- Run 3 — XX-TEST London office, prepared and driven through the UI 19 Oct 2026, 15:23 · r5 · recorded
- Run 3 — XX-TEST London office, prepared and driven through the UI 19 Oct 2026, 15:54 · r6 · accepted (Run 3 baseline freeze)
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 16:01 · RUN4 · recorded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 16:16 · r2 · recorded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 19:52 · r3 · superseded · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 20:15 · r4 · accepted (Run 4 baseline freeze)
- wf1-RUN4-DELIVERABLE-QA-20261020 20 Oct 2026, 00:00 · RUN4 · recorded
- wf1-RUN4-LOCAL-CHECKS-20261020 20 Oct 2026, 00:00 · RUN4 · recorded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 23:55 · superseded · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 20 Oct 2026, 00:20 · r2 · superseded · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 20 Oct 2026, 00:42 · r3 · superseded · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 20 Oct 2026, 00:52 · r4 · accepted (Run 4 baseline freeze)
Design revisions (proposed / accepted / not adopted) (87)
- WF1 Stage 3 provisional mechanical package — S3-P01 (2026-10-15) 15 Oct 2026, 00:00 · not adopted (no adoption record)
- wf1-CHANGE-CS01-20261016 16 Oct 2026, 00:00 · not adopted (no adoption record)
- wf1-STAGE3-FINAL-PROVISIONAL-20261016 16 Oct 2026, 00:00 · not adopted (no adoption record)
- WF1 Stage 3 provisional package — S3-P02 (2026-10-16) 16 Oct 2026, 00:00 · P02 · not adopted (no adoption record)
- WF1 Stage 3 — P03 provisional design-development candidate (2026-10-16) 16 Oct 2026, 00:00 · P03 · not adopted (no adoption record)
- wf1-STAGE3-P03-PREP-20261016 16 Oct 2026, 00:00 · P03 · not adopted (no adoption record)
- wf1-STAGE3-P03A-COORD-20261016 16 Oct 2026, 00:00 · P03A · not adopted (no adoption record)
- WF1 professional drawing presentation, plant selection and takeoff — 2026-10-17 17 Oct 2026, 00:00 · not adopted (no adoption record)
- WF1 P03E manufacturer candidates - PROPOSED - REQUIRES ENGINEER APPROVAL (2026-10-18) 18 Oct 2026, 00:00 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 18 Oct 2026, 00:00 · superseded · superseded
- WF1 P03E schedules, manufacturer register and calculation workbook 18 Oct 2026, 00:00 · r2 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 18 Oct 2026, 00:00 · r3 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 18 Oct 2026, 00:00 · r4 · superseded · superseded
- WF1 P03E schedules, manufacturer register and calculation workbook 18 Oct 2026, 00:00 · r5 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 18 Oct 2026, 00:00 · r6 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 18 Oct 2026, 00:00 · r7 · not adopted (no adoption record)
- wf1-P03E-CANDIDATE-20261018 18 Oct 2026, 00:00 · P03E · superseded · superseded
- wf1-P03E-CANDIDATE-20261018-r2 18 Oct 2026, 00:00 · P03E r2 · not adopted (no adoption record)
- wf1-P03E-CANDIDATE-20261018-r3 18 Oct 2026, 00:00 · P03E r3 · not adopted (no adoption record)
- wf1-P03E-CANDIDATE-20261018-r4 18 Oct 2026, 00:00 · P03E r4 · not adopted (no adoption record)
- WF1 P03E r5 candidate (provisional - not accepted geometry) 18 Oct 2026, 00:00 · P03E r5 · not adopted (no adoption record)
- WF1 P03E r6 candidate (provisional - not accepted geometry) 18 Oct 2026, 00:00 · P03E r6 · not adopted (no adoption record)
- wf1-P03E-CANDIDATE-20261018-r6-REJECTED-contract 18 Oct 2026, 00:00 · P03E r6 · rejected
- WF1 P03E r7 candidate - CANDIDATE PENDING APPROVAL 18 Oct 2026, 00:00 · P03E r7 · not adopted (no adoption record)
- WF1 P03E r7 candidate - CANDIDATE PENDING APPROVAL 18 Oct 2026, 00:00 · P03E r7-r2 · not adopted (no adoption record)
- WF1 P03E r8 candidate - CANDIDATE PENDING APPROVAL 18 Oct 2026, 00:00 · P03E r8 · not adopted (no adoption record)
- WF1 P03E r9 candidate - CANDIDATE PENDING APPROVAL 18 Oct 2026, 00:00 · P03E r9 · not adopted (no adoption record)
- WF1 P03E equipment selection from public manufacturer data (2026-10-19) 19 Oct 2026, 00:00 · not adopted (no adoption record)
- WF1 equipment selection, Run 4 (2026-10-19, schedules r11-TRIAL) 19 Oct 2026, 00:00 · RUN4 · not adopted (no adoption record)
- WF1 Run 4 equipment re-screen on the coordinated r11-r3 schedules (2026-10-19) 19 Oct 2026, 00:00 · RUN4 · not adopted (no adoption record)
- wf1-EQUIPMENT-SELECTION-20261019-RUN4-r11-r6 19 Oct 2026, 00:00 · RUN4 · superseded · superseded
- Equipment selection, Run 4 r11-r7 19 Oct 2026, 00:00 · RUN4 · not adopted (no adoption record)
- wf1-EQUIPMENT-SELECTION-20261019-r2 19 Oct 2026, 00:00 · r2 · not adopted (no adoption record)
- WF1 P03E equipment selection on the R02 model (2026-10-19, r3) 19 Oct 2026, 00:00 · r3 · not adopted (no adoption record)
- wf1-EQUIPMENT-SELECTION-20261019-r4 19 Oct 2026, 00:00 · r4 · accepted (Run 3 baseline freeze)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r10 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r10-r3 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r10-r3b · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r10-r4 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r10-r5 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r10-r6 · accepted (Run 3 baseline freeze)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r11 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r11-r3 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r11-r6 · superseded · superseded
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r11-r7 · accepted (Run 4 baseline freeze)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r11-r7-r2 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r8 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 19 Oct 2026, 00:00 · r9 · not adopted (no adoption record)
- P03E r11-r3: offline alternatives for D-R11-PIPE / D-R11-WX07 / T131-T138 (2026-10-19) 19 Oct 2026, 00:00 · P03E r11-r3 · not adopted (no adoption record)
- WF1 P03E r10 candidate - CANDIDATE PENDING APPROVAL 19 Oct 2026, 00:00 · P03E r10 · not adopted (no adoption record)
- WF1 P03E r10-r2 candidate - CANDIDATE PENDING APPROVAL 19 Oct 2026, 00:00 · P03E r10-r2 · not adopted (no adoption record)
- WF1 P03E r10-r3 candidate - CANDIDATE PENDING APPROVAL 19 Oct 2026, 00:00 · P03E r10-r3 · not adopted (no adoption record)
- WF1 P03E r10-r4 candidate - CANDIDATE PENDING APPROVAL 19 Oct 2026, 00:00 · P03E r10-r4 · not adopted (no adoption record)
- WF1 P03E r10-r5 candidate - CANDIDATE PENDING APPROVAL 19 Oct 2026, 00:00 · P03E r10-r5 · not adopted (no adoption record)
- WF1 P03E r10-r6 candidate - CANDIDATE PENDING APPROVAL 19 Oct 2026, 00:00 · P03E r10-r6 · accepted (Run 3 baseline freeze)
- WF1 P03E r11 (Run 4) - BLOCKED: NOT A CANDIDATE 19 Oct 2026, 00:00 · P03E r11 · not adopted (no adoption record)
- WF1 P03E r11-r2 (Run 4) - CANDIDATE PENDING APPROVAL (Run 4, offline; native Revit NOT RUN) 19 Oct 2026, 00:00 · P03E r11-r2 · superseded · superseded
- WF1 P03E r11-r2 (Run 4) - CANDIDATE PENDING APPROVAL (Run 4, offline; native Revit NOT RUN) 19 Oct 2026, 00:00 · P03E r11-r3 · not adopted (no adoption record)
- P03E r11-r4 (offline candidate, PROPOSED) 19 Oct 2026, 00:00 · P03E r11-r4 · not adopted (no adoption record)
- P03E r11-r5 (Run 4, offline, PROPOSED) 19 Oct 2026, 00:00 · P03E r11-r5 · not adopted (no adoption record)
- P03E r11-r6 (Run 4, offline, PROPOSED) 19 Oct 2026, 00:00 · P03E r11-r6 · superseded · superseded
- P03E r11-r7 (= r11-r6 with takeoff_reference recomputed) (Run 4, offline, PROPOSED) 19 Oct 2026, 00:00 · P03E r11-r7 · accepted (Run 4 baseline freeze)
- WF1 Run 3 criteria R02: aligned to the native IESVE Rev02 loads model (offline) 19 Oct 2026, 00:00 · RUN3 · accepted (Run 3 baseline freeze)
- Run 4 coordinated-route drawing set (D3) — P04, routes from P03E r11-r7 (2026-10-19) 19 Oct 2026, 00:00 · r11-r7 · not adopted (no adoption record)
- WF1 Run 4: owner change propagated to the design model (offline) 19 Oct 2026, 00:00 · RUN4 · accepted (Run 4 baseline freeze)
- wf1-BOQ-ILLUSTRATIVE-RUN3-RUN4-20261020-r1 20 Oct 2026, 00:00 · r1 · superseded · superseded
- WF1 BOQ and cost comparison — ILLUSTRATIVE — not verified market rates 20 Oct 2026, 00:00 · r2 · superseded · superseded
- WF1 BOQ and cost comparison — ILLUSTRATIVE — not verified market rates 20 Oct 2026, 00:00 · r3 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 20 Oct 2026, 00:00 · r11-r7-r3 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 20 Oct 2026, 00:00 · r11-r7-r4 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 20 Oct 2026, 00:00 · r11-r7-r5 · not adopted (no adoption record)
- WF1 P03E schedules, manufacturer register and calculation workbook 20 Oct 2026, 00:00 · r14 · not adopted (no adoption record)
- P03E r13 coordination alternatives (options only; r12 unchanged; native NOT RUN) 20 Oct 2026, 00:00 · P03E r13 · not adopted (no adoption record)
- P03E r12 (Run 4, offline, PROPOSED) 20 Oct 2026, 00:00 · P03E r12 · not adopted (no adoption record)
- P03E r14 — manufacturer-selection revision (CANDIDATE PENDING APPROVAL (Run 4 manufacturer-selection revision; offline; PROPOSED)) 20 Oct 2026, 00:00 · P03E r14 · not adopted (no adoption record)
- P03E r15 — CANDIDATE PENDING APPROVAL (Run 4 final manufacturer-geometry revision; offline) 20 Oct 2026, 00:00 · P03E r15 · not adopted (no adoption record)
- Run 4 coordinated-route drawing set — r2 (P05, 2026-10-20): rise / drop marks added 20 Oct 2026, 00:00 · r2 · accepted (Run 4 baseline freeze)
- Coordinated drawings P06 — PROPOSED manufacturer-selection revision (NOT FOR ISSUE) 20 Oct 2026, 00:00 · r3 · proposed (not adopted)
- Coordinated drawings P06-r15-PROPOSED (16 sheets) 20 Oct 2026, 00:00 · r4 · proposed (not adopted)
- Run 4 equipment status by evidence level (2026-10-20) 20 Oct 2026, 00:00 · RUN4 · not adopted (no adoption record)
- Run 4 equipment status r2 — UK manufacturer survey merged (2026-10-20) 20 Oct 2026, 00:00 · r2 · not adopted (no adoption record)
- Run 4 equipment status r3 — TROX PWX FCUs merged (2026-10-20) 20 Oct 2026, 00:00 · r3 · not adopted (no adoption record)
- WF1 Run 4 manufacturer selection, round 2 (2026-10-20) 20 Oct 2026, 00:00 · RUN4 · not adopted (no adoption record)
- WF1 Run 4 manufacturer selection, round 3 (2026-10-20) 20 Oct 2026, 00:00 · r2 · not adopted (no adoption record)
- WF1 Run 4 — manufacturer selection r3 (XX-TEST synthetic project; provisional, nothing approved) 20 Oct 2026, 00:00 · r3 · not adopted (no adoption record)
- WF1 Run 4: Stage 4 drawing set P07, PROPOSED (2026-10-20) 20 Oct 2026, 00:00 · P07 · proposed (not adopted)
- WF1 Stage 4 workbooks (2026-10-20) 20 Oct 2026, 00:00 · RUN4 · not adopted (no adoption record)
Failed or superseded (20)
- wf1-MECH-SCHEDULES-20261019-r11-r6-attempt1-FAILED 19 Oct 2026, 00:00 · r11-r6 · failed attempt · superseded
- Run 3 — XX-TEST London office, prepared and driven through the UI 19 Oct 2026, 00:00 · r4 · failed attempt
- Run 3 — XX-TEST London office, prepared and driven through the UI 19 Oct 2026, 00:00 · r5 · failed attempt
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 00:00 · r2 · failed attempt
- wf1-RUN4-LONDON-OFFICE-20261019-r2-attempt2-STALETMP 19 Oct 2026, 00:00 · r2 · failed attempt
- wf1-RUN4-LONDON-OFFICE-20261019-attempt1-SCRIPTERROR 19 Oct 2026, 15:57 · RUN4 · failed attempt
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 19:46 · r3 · failed attempt · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 19:49 · r3 · failed attempt · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 19:50 · r3 · failed attempt · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 20 Oct 2026, 00:00 · failed attempt · superseded
- wf1-MECH-SCHEDULES-20261020-r14-attempt1-FAILED 20 Oct 2026, 00:00 · r14 · failed attempt · superseded
- wf1-P03E-CANDIDATE-20261020-r12-attempt1-FAILED 20 Oct 2026, 00:00 · P03E r12 · failed attempt · superseded
- wf1-RUN4-FCU-TROX-ABILITY-20261020-attempt1-METHOD 20 Oct 2026, 00:00 · RUN4 · failed attempt · superseded
- WF1 Run 4 manufacturer selection, round 2 (2026-10-20) 20 Oct 2026, 00:00 · RUN4 · failed attempt · superseded
- WF1 Run 4 manufacturer selection, round 2 (2026-10-20) 20 Oct 2026, 00:00 · RUN4 · failed attempt · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 23:31 · failed attempt · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 23:34 · failed attempt · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 23:42 · failed attempt · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 19 Oct 2026, 23:49 · failed attempt · superseded
- Run 4 — XX-TEST London office: the owner's design change, driven through the UI 20 Oct 2026, 00:40 · r3 · failed attempt · superseded
Design change and approval records (1)
- Criteria revision 1 — Baseline: S3-P03A coordination candidate (tag wf1-stage3-p03a) 16 Oct 2026, 18:46 · criteria R1 · recorded
Supporting evidence (52)
- iesve-wf1-London_Test-backup-20261014T230436Z 14 Oct 2026, 23:04 · recorded
- iesve-wf1-London_Test-backup-20261014T231153Z-preThermal 14 Oct 2026, 23:11 · recorded
- iesve-wf1-London_Test-backup-20261014T233008Z-afterFounderEdits 14 Oct 2026, 23:30 · recorded
- iesve-wf1-FCU-provisional-20261015 15 Oct 2026, 00:00 · recorded
- iesve-wf1-MECH-CALC-PACKAGE-20261015 15 Oct 2026, 00:00 · recorded
- iesve-wf1-SCHEDULES-GF-Rev02-20261015 15 Oct 2026, 00:00 · accepted (Run 3 baseline freeze)
- iesve-wf1-SCHEDULES-from-SC02-20261015 15 Oct 2026, 00:00 · recorded
- Manufacturer catalogue: WF1 FCU selection evidence (local only, D-01), 2026-10-15 15 Oct 2026, 00:00 · recorded
- iesve-wf1-London_Test-backup-20261015T003934Z-preAutomation 15 Oct 2026, 00:39 · recorded
- iesve-wf1-London_Test-backup-20261015T010027Z-preWriteAutomation 15 Oct 2026, 01:00 · recorded
- iesve-wf1-automation-screens 15 Oct 2026, 02:12 · recorded
- iesve-wf1-AUTOTEST-backup-20261015T033556Z-preLoads 15 Oct 2026, 03:35 · recorded
- iesve-wf1-AUTOTEST-backup-20261015T040621Z-preCIBSE 15 Oct 2026, 04:06 · recorded
- iesve-wf1-AUTOTEST-backup-20261015T045906Z-mainSystem 15 Oct 2026, 04:59 · recorded
- iesve-wf1-AUTOTEST-backup-20261015T052357Z-preH01C01 15 Oct 2026, 05:23 · recorded
- iesve-wf1-AUTOTEST-backup-20261015T071516Z-preGFRev02 15 Oct 2026, 07:15 · recorded
- iesve-wf1-AUTOTEST-backup-20261015T074744Z-GFRev02-preRuns 15 Oct 2026, 07:47 · recorded
- WF1 Revit 2026 — installation feasibility on this machine (2026-10-17) 17 Oct 2026, 00:00 · recorded
- WF1 Revit 2026 — host handover (off-host prerequisites complete; NATIVE VERIFIED: NO) 17 Oct 2026, 00:00 · recorded
- wf1-REVIT-NATIVE-KIT-20261017 17 Oct 2026, 00:00 · recorded
- WF1 Revit 2026 — off-host prerequisites (added 2026-10-17) 17 Oct 2026, 00:00 · recorded
- iesve-wf1-AUTOTEST-backup-20261017T0105Z-preCS01 17 Oct 2026, 01:05 · recorded
- wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-58aa23a9-REVIEW 18 Oct 2026, 00:00 · review
- wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-7ffa541a-REVIEW 18 Oct 2026, 00:00 · review
- wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-aa41600b-REVIEW 18 Oct 2026, 00:00 · review
- wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261018-ec4ca782-REVIEW 18 Oct 2026, 00:00 · review
- wf1-NATIVE-REVIT-APS-DIAG-20261018-362e6b1c-REVIEW 18 Oct 2026, 00:00 · review
- WF1 P03E coordination options (from r5) 18 Oct 2026, 00:00 · P03E · recorded
- wf1-REVIT-APS-PACKAGE-20261018 18 Oct 2026, 00:00 · recorded
- wf1-REVIT-OFFLINE-PREP-20261018 18 Oct 2026, 00:00 · recorded
- wf1-REVIT-PROBE-FINDINGS-20261018 18 Oct 2026, 00:00 · recorded
- wf1-REVIT-READINESS-20261018 18 Oct 2026, 00:00 · recorded
- Run 4 preparation: native IESVE re-run route on the Rev02 project (2026-10-19) 19 Oct 2026, 00:00 · RUN4 · recorded
- Native bootstrap 251a3330 (Run 4 r11): review 19 Oct 2026, 00:00 · review
- Minimal bootstrap 381f2851 (Run 4 r11-r5: T165, T166, corrected routing range) 19 Oct 2026, 00:00 · review
- wf1-NATIVE-REVIT-APS-BOOTSTRAP-20261019-927f266c-REVIEW 19 Oct 2026, 00:00 · accepted (Run 3 baseline freeze)
- Minimal bootstrap b537f720 (Run 4 r11-r5: T165, T166) 19 Oct 2026, 00:00 · review
- wf1-P03E-DECISIONS-PENDING-20261019 19 Oct 2026, 00:00 · P03E · recorded
- wf1-RUN3-LOADS-CORRESPONDENCE-20261019 19 Oct 2026, 00:00 · RUN3 · recorded
- Run 4 native Revit MEP model 67a01b14: verification and reconciliation (2026-10-19) 19 Oct 2026, 00:00 · RUN4 · recorded
- Run 4 native Revit MEP model 1ce22c7e (plan r11-r7): verification and reconciliation (2026-10-19) 19 Oct 2026, 00:00 · r2 · accepted (Run 4 baseline freeze)
- FCU manufacturer-dimension check against P03E r12 (PROVISIONAL) 20 Oct 2026, 00:00 · P03E · recorded
- wf1-RUN4-ENGINEERING-QA-PACKAGE-20261020 20 Oct 2026, 00:00 · RUN4 · recorded
- WF1 Run 4 — non-FCU equipment data round (J2), 2026-10-20 20 Oct 2026, 00:00 · RUN4 · recorded
- WF1 Run 4 FCU data round (J1, 2026-10-20) — XX-TEST synthetic project 20 Oct 2026, 00:00 · RUN4 · recorded
- wf1-RUN4-FCU-TROX-ABILITY-20261020 20 Oct 2026, 00:00 · RUN4 · recorded
- WF1 Run 4: Guide C out-of-range, index path and manufacturer Δp audit (2026-10-20) 20 Oct 2026, 00:00 · RUN4 · recorded
- wf1-RUN4-SELECTION-TOOL-PACKS-20261020 20 Oct 2026, 00:00 · RUN4 · recorded
- UK AHU / heat-pump survey for AHU-01 and HP-01 (2026-10-20, fork L2) 20 Oct 2026, 00:00 · RUN4 · recorded
- UK FCU survey (Run 4, 12 FCUs) — 2026-10-20 20 Oct 2026, 00:00 · RUN4 · recorded
- wf1-RUN4-UK-TERMINALS-FANS-SURVEY-20261020 20 Oct 2026, 00:00 · RUN4 · recorded
- wf1-STAGE4-CAD-LIBRARY-20261020 20 Oct 2026, 00:00 · recorded
Tooling (2)
- dxf-check-venv 14 Oct 2026, 05:18 · not evidence
- dxf-check-py312 14 Oct 2026, 05:25 · not evidence