Investor demonstration · read-only

Read-only demonstration. Four sanitised or hypothetical engineering projects. Each states its own validation status; nothing shown is engineer approved.

DELIVERY

RIBA stages 0–7

Stage deliverables, required inputs and gates. Every status is derived from the project's evidence; provisional or evidenced is not engineering approval. Stages 5–7 are interface definitions only.

Stage status

UK mechanical services — RIBA Plan of Work 2020 (default)

Current: Stage 4 — Technical Design (derived from evidence) — 5 of 7 deliverables produced, 2 gates open. Statuses are derived from evidence. Provisional / evidenced is not engineering approval; Stages 5-7 are interface definitions only.

StageStateDeliverables producedGates
Stage 0 — Strategic Definitionin progress1 / 2open
Stage 1 — Preparation and Briefingin progress2 / 3open
Stage 2 — Concept Designin progress2 / 2open
Stage 3 — Spatial Coordinationin progress4 / 4open
Stage 4 — Technical Design ◀ currentin progress5 / 7open open
Stage 5 — Manufacturing and Constructionnot automatedinterface onlynot automated
Stage 6 — Handovernot automatedinterface onlynot automated
Stage 7 — Usenot automatedinterface onlynot automated

Stage deliverables, gates and plan

RIBA Plan of Work 2020 stage names; deliverable split after BSRIA BG 6 (engineering.delivery.framework). Wording and mappings are Hexanta's. Evidence from: Change run — criteria revision 3 — RECORDED (verified evidence, not re-run).

Stage 0 — Strategic Definition

in progress Required inputs: client requirements, site information.

GateStateDetail
Client confirms the strategic briefopenno checking / sign-off recorded (no verified engineer)
DeliverableResponsibleStatusDetailEvidence
Project profile (jurisdiction, building type, disciplines, software)project leadprovisional
project profile
Business case and client requirements
Client document; not produced by Hexanta.
clientnot started

Stage 1 — Preparation and Briefing

in progress Required inputs: architectural template, project profile.

GateStateDetail
Design criteria agreed with the clientopenno checking / sign-off recorded (no verified engineer)
DeliverableResponsibleStatusDetailEvidence
Mechanical design criteria (internal conditions, occupancy, ventilation rates)building services engineerprovisional
criteria revision 3
Architectural basis (room template / geometry)architectprovisional
input architecture_template revision 1
Design-responsibility allocation
Framework implemented (engineering.delivery.framework.scope); no appointment recorded for this project.
project leadnot started

Stage 2 — Concept Design

in progress Required inputs: design criteria, architectural basis.

GateStateDetail
Concept systems strategy acceptedopenno checking / sign-off recorded (no verified engineer)
DeliverableResponsibleStatusDetailEvidence
Room heating and cooling loads (native IESVE)building services engineerevidencednative iesve: native_verified (not engineer approved)
wf1-NATIVE-IESVE-RUN4-20261019-r3
Design criteria and systems strategy reportbuilding services engineerprovisionalChange run — criteria revision 3 — RECORDED (verified evidence, not re-run)
documents/WF1_Mechanical_Design_Criteria_Report.docx

Stage 3 — Spatial Coordination

in progress Required inputs: room loads, mechanical configuration.

GateStateDetail
Spatially coordinated design acceptedopenno checking / sign-off recorded (no verified engineer)
DeliverableResponsibleStatusDetailEvidence
Coordinated design model (basis)building services engineerprovisionalChange run — criteria revision 3 — RECORDED (verified evidence, not re-run)
model/wf1_stage3_model.json
Stage 3 schedulesbuilding services engineerprovisionalChange run — criteria revision 3 — RECORDED (verified evidence, not re-run)
documents/WF1_Stage3_Schedules.xlsx
Outline specificationbuilding services engineerprovisionalChange run — criteria revision 3 — RECORDED (verified evidence, not re-run)
specification/VERIFY.txt
Design-basis drawingsbuilding services engineerprovisionalChange run — criteria revision 3 — RECORDED (verified evidence, not re-run)
drawings/WF1-HXA-ZZ-GF-DR-M-5001.dxf
drawings/WF1-HXA-ZZ-GF-DR-M-5002.dxf
drawings/WF1-HXA-ZZ-GF-DR-M-5101.dxf
… 13 more

Stage 4 — Technical Design (current)

in progress Required inputs: coordinated plan, selection register, manufacturer data, fitting-loss source.

GateStateDetail
Engineer checking and sign-off recordedopenno checking / sign-off recorded (no verified engineer)
Engineering closeout register clearedopen20 closeout items outstanding (closeout register)
DeliverableResponsibleStatusDetailEvidence
Design calculations (loads, ventilation, plant, hydronic and air sizing, pressure losses)
Pump and fan duties are partial lower bounds (CIBSE Guide C fittings; out-of-range cases bounded); design margins not set.
building services engineerprovisionalChange run — criteria revision 3 — RECORDED (verified evidence, not re-run)
workbook/HEXANTA_WF1_MECHANICAL_DESIGN_CALCULATIONS.xlsx
wf1-RUN4-STAGE4-WORKBOOKS-20261020
Selected equipment (provisional)building services engineerprovisional93/96 catalogue-selected, 74 duty verified, 39 dimension verified, 0 BIM, 22 confirmation required
wf1-RUN4-EQUIPMENT-STATUS-20261020-r3
wf1-RUN4-STAGE4-WORKBOOKS-20261020
Native Revit MEP modelbuilding services engineerevidencednative revit: native_verified (not engineer approved)
wf1-NATIVE-REVIT-APS-MEP-20261019-1ce22c7e
Coordinated drawings (native AutoCAD)building services engineerevidencednative DWG verified; not engineer approved
wf1-RUN4-COORDINATED-DRAWINGS-20261020-r2
wf1-NATIVE-DWG-RUN4-COORD-20261020-r2
Specification (NBS)
NBS is a separate pending workstream (licence).
building services engineerpending external
Bill of quantities / cost planbuilding services engineerpartialQuantities reconciled; no held rates - any cost shown uses illustrative rates
takeoff/TAKEOFF_ACCURACY.md
takeoff/takeoff_accuracy.json
Engineering review and sign-offbuilding services engineeroutstandingno checking / sign-off recorded (no verified engineer)

Stage 4 equipment and calculation workbooks

PROVISIONAL - NOT ENGINEER APPROVED - NOT FOR CONSTRUCTION · revision S4-P01 · 2026-10-20 · evidence wf1-RUN4-STAGE4-WORKBOOKS-20261020. Evidence files read from this host (not stored in the project): built from the sources listed per run, not re-run here. Calculation workbooks that contain licensed reference data stay on this host and are not for onward distribution.

Run 3 - baseline (tag wf1-run3-baseline-20261019) (4)

Built from: wf1-MECH-SCHEDULES-20261019-r10-r6/schedules.json · wf1-EQUIPMENT-SELECTION-20261019-r4/selection.json · apps/api/src/hexanta_api/product/catalogue/records (git) · wf1-DEMO-LONDON-OFFICE-20261020-r4/run-baseline/workbook/HEXANTA_WF1_MECHANICAL_DESIGN_CALCULATIONS.xlsx · wf1-MECH-SCHEDULES-20261019-r10-r6/WF1_P03E_Calculation_Workbook.xlsx

FileSizeSHA-256Open
HEXANTA_WF1_RUN3_Calculation_Workbook.pdf4.6 MB3583f3e4a4b3Download · View
HEXANTA_WF1_RUN3_Calculation_Workbook.xlsx217 KBd87c3cb52bb9Download
HEXANTA_WF1_RUN3_Mechanical_Equipment_Workbook.pdf3.4 MB8b57ab0edafdDownload · View
HEXANTA_WF1_RUN3_Mechanical_Equipment_Workbook.xlsx129 KB89b89a2f903bDownload
Run 4 - accepted model (tag wf1-run4-accepted-20261020) (4)

Built from: wf1-MECH-SCHEDULES-20261020-r11-r7-r5/schedules.json · wf1-RUN4-EQUIPMENT-STATUS-20261020-r3/selection.json · wf1-RUN4-EQUIPMENT-STATUS-20261020-r3/levels.json · apps/api/src/hexanta_api/product/catalogue/records (git) · wf1-DEMO-LONDON-OFFICE-20261020-r4/run-change/workbook/HEXANTA_WF1_MECHANICAL_DESIGN_CALCULATIONS.xlsx · wf1-MECH-SCHEDULES-20261020-r11-r7-r5/WF1_P03E_Calculation_Workbook.xlsx

FileSizeSHA-256Open
HEXANTA_WF1_RUN4_Calculation_Workbook.pdf9.3 MBa38199d3746fDownload · View
HEXANTA_WF1_RUN4_Calculation_Workbook.xlsx—29c330f9f0b3Download
HEXANTA_WF1_RUN4_Mechanical_Equipment_Workbook.pdf5.5 MB666b2eb32350Download · View
HEXANTA_WF1_RUN4_Mechanical_Equipment_Workbook.xlsx217 KB58684bbf2a38Download

Stage 5 — Manufacturing and Construction

not automated Interface definition only — Hexanta does not automate this stage. Required inputs: Stage 4 information issued for construction.

GateStateDetail
Practical completionnot automatedInterface definition only — Hexanta does not automate this stage.
DeliverableResponsibleStatusDetailEvidence
Requests for information / technical queriesMEP contractornot automatedInterface definition only — Hexanta does not automate this stage.
Contractor submittals and installation drawing reviewbuilding services engineernot automatedInterface definition only — Hexanta does not automate this stage.
Site inspections and observation reportsbuilding services engineernot automatedInterface definition only — Hexanta does not automate this stage.

Stage 6 — Handover

not automated Interface definition only — Hexanta does not automate this stage. Required inputs: installed systems, commissioning plan.

GateStateDetail
Handover acceptednot automatedInterface definition only — Hexanta does not automate this stage.
DeliverableResponsibleStatusDetailEvidence
Commissioning and witnessing recordscommissioning managernot automatedInterface definition only — Hexanta does not automate this stage.
As-built (record) drawings and modelMEP contractornot automatedInterface definition only — Hexanta does not automate this stage.
Operation and maintenance informationMEP contractornot automatedInterface definition only — Hexanta does not automate this stage.

Stage 7 — Use

not automated Interface definition only — Hexanta does not automate this stage. Required inputs: asset information, metered data.

GateStateDetail
Post-occupancy reviewnot automatedInterface definition only — Hexanta does not automate this stage.
DeliverableResponsibleStatusDetailEvidence
Asset recordsfacilities managernot automatedInterface definition only — Hexanta does not automate this stage.
Performance monitoring and in-use evaluationfacilities managernot automatedInterface definition only — Hexanta does not automate this stage.

Contract stage plan

Stage plan for this contract
StageModeMerge intoOverlaps previousReason (required to skip or merge)
0 — Strategic Definition—
1 — Preparation and Briefing—
2 — Concept Design—
3 — Spatial Coordination—
4 — Technical Design—
5 — Manufacturing and Construction—
6 — Handover—
7 — Use—

Plan revision — (default template). Statuses are always derived from evidence; the plan only changes which stages apply.

Back to overview