CHANGE MANAGEMENT

Revisions, runs and approvals

Every criteria revision, every calculation run (live or recorded evidence) and every engineer decision, with who and when.

Run comparison (change impact)

Compares two persisted runs (default: the first baseline and the latest run): room loads and their native provenance, ventilation, FCU and plant duties, sizes, drawings (entity level), schedules, design changes and revision consistency. Every change must be downstream of the changed criteria; anything else is reported as a FAIL, never hidden.

Run and revision history

  1. 1. Baseline run — criteria revision 1 — RECORDED (verified evidence, not re-run) succeeded reused evidence (recorded run, not re-run)

    Date
    20 Oct 2026, 06:50 (originally executed 20 Oct 2026, 00:51, run 96ea4103)
    Run id
    c0fc0fd8-fd61-484b-a401-31d7cdcae8a0
    Criteria
    revision 1 · fingerprint 279efd496d45
    Calculation status
    1 blocked · 13 succeeded · 75 outputs
    Drawing / model revision
    S3-P03B (provisional coordination candidate, regenerated) · model S3-P03B (provisional coordination candidate, regenerated) aa4558721125
    Evidence
    wf1-DEMO-LONDON-OFFICE-20261020-r4/run-baseline/ · SHA256SUMS sha256 6cb0b0f6b4ab
    Key quantities
    condensate pumps 12 nr · ductwork 268.7 m · equipment 15 nr · fittings 147 nr · pipework 446.4 m · primary pipework 31.4 m · valves 26 nr
    Criteria change recorded with revision 1 (0 parameters)

    Workflow 1 room template wf1-london-office-synthetic-01 and design basis adopted (template revision R02: WF1 room template + design basis aligned to the native IESVE Rev02 loads model; PROPOSED (recorded design-basis change; not engineer approved))

    No parameter edits.

    Deliverables of this run

  2. 2. Change run — criteria revision 3 — RECORDED (verified evidence, not re-run) succeeded reused evidence (recorded run, not re-run)

    Date
    20 Oct 2026, 06:50 (originally executed 20 Oct 2026, 00:52, run e94eee59)
    Run id
    3773820c-462e-4f76-931c-2f2ed3dda912
    Criteria
    revision 3 · fingerprint a0babb29f569
    Calculation status
    1 blocked · 2 coordination required · 1 failed · 10 succeeded · 77 outputs
    Drawing / model revision
    S3-P03C-CR003 (change on the P03A coordination candidate) · model S3-P03C-CR003 (change on the P03A coordination candidate) 3e2692754b59
    Evidence
    wf1-DEMO-LONDON-OFFICE-20261020-r4/run-change/ · SHA256SUMS sha256 6cb0b0f6b4ab
    Key quantities
    condensate pumps 12 nr · ductwork 268.7 m · equipment 15 nr · fittings 147 nr · pipework 446.4 m · primary pipework 31.4 m · valves 26 nr
    Criteria change recorded with revision 3 (10 parameters)

    Native IESVE loads applied from wf1-NATIVE-IESVE-RUN4-20261019-r3

    ParameterBeforeAfter
    Room r01a — Open-plan office zone 1: Occupancy17 person34 person
    Room r01a — Open-plan office zone 1: Lighting8 W/m²16 W/m²
    Room r01b — Open-plan office zone 2: Occupancy17 person34 person
    Room r01b — Open-plan office zone 2: Lighting8 W/m²16 W/m²
    Room r01c — Open-plan office zone 3: Occupancy17 person34 person
    Room r01c — Open-plan office zone 3: Lighting8 W/m²16 W/m²
    Room r02 — Meeting room 1: Occupancy12 person24 person
    Room r02 — Meeting room 1: Lighting8 W/m²16 W/m²
    Room r03 — Meeting room 2: Occupancy12 person24 person
    Room r03 — Meeting room 2: Lighting8 W/m²16 W/m²
    Criteria differences vs the previous run (computed, 10)
    ParameterBeforeAfter
    case.rooms[r01a].lighting_density.value8 16
    case.rooms[r01a].occupancy.value17 34
    case.rooms[r01b].lighting_density.value8 16
    case.rooms[r01b].occupancy.value17 34
    case.rooms[r01c].lighting_density.value8 16
    case.rooms[r01c].occupancy.value17 34
    case.rooms[r02].lighting_density.value8 16
    case.rooms[r02].occupancy.value12 24
    case.rooms[r03].lighting_density.value8 16
    case.rooms[r03].occupancy.value12 24

    Deliverables of this run ·

Make a change

Change room use, occupancy, gains, constructions, design conditions, ventilation rates, water temperatures or sizing limits in Criteria. Hexanta shows the impact, invalidates stale outputs, and regenerates every supported calculation and document when you run it. Location/weather and architectural geometry changes require an IESVE re-run (native loads) before they can be recalculated.

The latest run uses the current criteria revision.

Record an engineer decision

Decisions are recorded with an unverified development identity: they are not authenticated engineering approvals.

Design changes

2 change(s). states are derived from human decision records; nothing is approved here. Identity: development, unverified — decisions are records, not professional sign-off.

ChangeStateModelAffectsRaisedDecisions
COORD-P03C
Re-coordinate OA:oa-m2, OA:oa-m3, OA:oa-m4, OA:oa-m5, OA:oa-m6, GEX:gx-m1, GEX:gx-m2, GEX:gx-m3, GEX:gx-m5, GEX:gx-ws: resized duct outside its coordinated envelope
The design resized the duct after coordination, so the coordinated run-level envelope no longer fits it. The Revit plan holds the envelope bottom and places the duct at the PROPOSED level; services above were not re-checked. OA:oa-m2 1200x300: coordinated envelope 2932-3342 mm (410 mm deep); required 460 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 25) + 300 mm); with the bottom held the top moves 50 mm, margin to soffit 208 mm OA:oa-m3 1000x300: coordinated envelope 2932-3342 mm (410 mm deep); required 460 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 25) + 300 mm); with the bottom held the top moves 50 mm, margin to soffit 208 mm OA:oa-m4 900x250: coordinated envelope 2932-3392 mm (460 mm deep); required 410 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 25) + 250 mm); with the bottom held the top moves -50 mm, margin to soffit 258 mm OA:oa-m5 700x250: coordinated envelope 2932-3392 mm (460 mm deep); required 410 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 25) + 250 mm); with the bottom held the top moves -50 mm, margin to soffit 258 mm OA:oa-m6 400x300: coordinated envelope 2939-3349 mm (410 mm deep); required 460 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 25) + 300 mm); with the bottom held the top moves 50 mm, margin to soffit 201 mm GEX:gx-m1 1000x300: coordinated envelope 3050-3410 mm (360 mm deep); required 410 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 0) + 300 mm); with the bottom held the top moves 50 mm, margin to soffit 140 mm GEX:gx-m2 1000x250: coordinated envelope 3050-3460 mm (410 mm deep); required 360 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 0) + 250 mm); with the bottom held the top moves -50 mm, margin to soffit 190 mm GEX:gx-m3 800x250: coordinated envelope 3050-3460 mm (410 mm deep); required 360 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 0) + 250 mm); with the bottom held the top moves -50 mm, margin to soffit 190 mm GEX:gx-m5 400x250: coordinated envelope 3100-3410 mm (310 mm deep); required 360 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 0) + 250 mm); with the bottom held the top moves 50 mm, margin to soffit 140 mm GEX:gx-ws 300x250: coordinated envelope 3100-3410 mm (310 mm deep); required 360 mm (required depth = bearer + 2 x (flange + insulation) + h; 50 + 2 x (30 + 0) + 250 mm); with the bottom held the top moves 50 mm, margin to soffit 140 mm
proposedP03C -> P03D10 element(s)hexanta-pipeline
2026-10-20T06:50:59.988848+00:00
    XX-RUN4-DC-01
    XX-TEST Run 4 owner change: occupancy x2 and lighting x2 in 5 rooms (criteria R04)
    XX-TEST owner brief change R04 (owner-confirmed 2026-10-19); native IESVE RUN4E loads; AHU outdoor air, FCUs, ducts, pipes and plant resized by the change run [REPLAYED in the review project from wf1-DEMO-LONDON-OFFICE-20261020-r4 http/07-api-design-changes.txt]
    approvedP03B -> P03C5 element(s) · AHU-01, FCU-GF-01, FCU-GF-02, FCU-GF-03, FCU-GF-04, FCU-GF-05, FCU-GF-06, FCU-GF-09, FCU-GF-10 · WF1-HXA-ZZ-GF-DR-M-5001 P03B->P03C · WF1_Stage3_Schedules.xlsxdev-unverified:XX-TEST designer
    2026-10-20T06:51:03.969635+00:00
    • approved by dev-unverified:XX-TEST engineer 2026-10-20T06:51:03.979385+00:00 — XX-TEST checked the Run 4 change run outputs [REPLAYED in the review project from wf1-DEMO-LONDON-OFFICE-20261020-r4 (original 2026-10-20T00:52:40.057673+00:00)]
    Propose a design change
    Affected drawing (optional)

    A change stays proposed until a named person other than the one who raised it approves or rejects that exact version. Editing a change re-opens it. Names are unverified development identities, not professional sign-off.

    Runs

    RunKindCriteria rev.StatusStepsFinishedBy
    Change run — criteria revision 3 — RECORDED (verified evidence, not re-run) 3773820clive change3succeeded Independent specification check (values traced to the model) blocked20 Oct 2026, 06:50XX-TEST operator (review replay) — RECORDED (verified evidence, not re-run)
    Baseline run — criteria revision 1 — RECORDED (verified evidence, not re-run) c0fc0fd8live baseline1succeeded Independent specification check (values traced to the model) blocked20 Oct 2026, 06:50XX-TEST operator (review replay) — RECORDED (verified evidence, not re-run)

    Recorded evidence runs are the frozen, hashed packages imported read-only (P03, P03A, CS-01). Live runs are executed by Hexanta now, from the persisted criteria and inputs.

    Criteria revisions

    1. Revision 3 20 Oct 2026, 06:50 · human:dev-unverified:XX-TEST operator (review replay) — Native IESVE loads applied from wf1-NATIVE-IESVE-RUN4-20261019-r3

      Impact: room_loads → fcu_requirements → ahu_plant_duties → chw_lthw_flows → pipes_pumps → ventilation_ducts → revit_cad → schedules → specifications → takeoff → reports

    2. Revision 2 20 Oct 2026, 06:50 · human:dev-unverified:XX-TEST operator (review replay) — R04 (WF1 Run 4 owner change: occupancy x2 and lighting x2 in MT000000, MT000001, PN000000, PN000001, PN000002); raised by XX-TEST designer; owner-confirmed 2026-10-19: the Run 4 change is DOUBLE the original occupancy and DOUBLE the original lighting gains (x2, i.e. a 100% increase), NOT a 200% increase.

      Impact: room_loads → fcu_requirements → ahu_plant_duties → chw_lthw_flows → pipes_pumps → ventilation_ducts → revit_cad → schedules → specifications → takeoff → reports

    3. Revision 1 20 Oct 2026, 06:50 · human:dev-unverified:XX-TEST operator (review replay) — Workflow 1 room template wf1-london-office-synthetic-01 and design basis adopted (template revision R02: WF1 room template + design basis aligned to the native IESVE Rev02 loads model; PROPOSED (recorded design-basis change; not engineer approved))

    Compare design revisions

    Loading design revisions…

    Complete project history

    Loading the project history…

    Approval history

    • No decisions recorded.