Read-only demonstration. Four sanitised or hypothetical engineering projects. Each states its own validation status; nothing shown is engineer approved.
CAD DRAWINGS AND SCHEMATICS
Drawing register and viewer
Every drawing set of this project by revision — the current PROPOSED revision first, earlier revisions and superseded sets kept. Native verification, proposal status and professional checking are shown separately.
P07 PROPOSED — not accepted, not engineer approved, not for construction
Checked by / approved by: NOT RECORDED — no verified engineer identity; nothing here is engineer approved or issued for construction.
11 sheets at P08
WF1-HXA-ZZ-GF-DR-M-5111
Four-pipe CHW / LTHW GA — ground floor part plan 1 (west)
Revision P08 · NATIVE EXECUTED — not accepted (see the native review)
native Revit sheet (APS Revit 2026 work item) — set native-revit-ga-p08-proposed-sheets (wf1-NATIVE-REVIT-APS-GA-20261022-14eb2f88-SHEETS-r2)
four-pipe part plan 1 unchanged in content from P07 (west part plan)
Native AutoCAD DWG
NOT APPLICABLEDWG exported by native Revit (not an AutoCAD conversion)
Checking
Checked / approved: NOT RECORDED — not engineer approved, not for construction.
Per-sheet files of work item 14eb2f88 (HexantaGa v10, owner-approved; PASS 93/93) on the PROPOSED model d427192e; DWGs byte-identical; visual 5 PASS / 1 PARTIAL (M-5301 dense labels at HDR-01). NOT ADOPTED: P07 stays current.
Every set is read from its evidence folder or the project database and checked against its SHA-256; nothing is rewritten. Native AutoCAD DWGs are attached only by an acceptance record whose source SHA-256 equals the sheet's DXF. Native Revit GA status, proposal status and professional checking are separate.