Read-only demonstration. Four sanitised or hypothetical engineering projects. Each states its own validation status; nothing shown is engineer approved.
CALCULATIONS AND SCHEDULES
Calculations, schedules and BOQ
The current calculation package, equipment Required / Offered schedules and BOQ, with each run's own calculation workbook and schedules — by topic, with revision, source, native evidence status, previews and downloads.
P07 PROPOSED — not checked or approved by an engineer, not for construction
Checked by / approved by: NOT RECORDED — no verified engineer identity; nothing here is engineer approved or issued for construction.
PROPOSED — not checked or approved by an engineer, not for construction. Workbooks holding licensed CIBSE Guide C data stay local (named, with the reason); their review pages and every other workbook download here with their SHA-256.
Showing the documents for LTHWP-01A/B — its data sheet "M30 LTHWP-01A-B" is open below.
Equipment schedules (Required / Offered)
Appendix A data sheets, Stage 3 schedules and the native Revit schedule sheet M-5951
Equipment data sheets — Appendix A (Required / Offered, P07)
PROPOSED — not accepted, not checked, not approvedP07Run 4