Investor demonstration · read-only

Read-only demonstration. Four sanitised or hypothetical engineering projects. Each states its own validation status; nothing shown is engineer approved.

CALCULATIONS AND SCHEDULES

Calculations, schedules and BOQ

The current calculation package, equipment Required / Offered schedules and BOQ, with each run's own calculation workbook and schedules — by topic, with revision, source, native evidence status, previews and downloads.

P07 PROPOSED — not checked or approved by an engineer, not for construction

Checked by / approved by: NOT RECORDED — no verified engineer identity; nothing here is engineer approved or issued for construction.

PROPOSED — not checked or approved by an engineer, not for construction. Workbooks holding licensed CIBSE Guide C data stay local (named, with the reason); their review pages and every other workbook download here with their SHA-256.

Showing the documents for DP-01/02 — no data sheet of this tag is held.

Equipment schedules (Required / Offered)

Appendix A data sheets, Stage 3 schedules and the native Revit schedule sheet M-5951

Equipment data sheets — Appendix A (Required / Offered, P07)

PROPOSED — not accepted, not checked, not approvedP07Run 4

Source: wf1-STAGE4-WORKBOOKS-FINAL-20261021-r2 (manifest SHA-256 08ce9ab12163)

  • Download XLSX HEXANTA_WF1_RUN4_Equipment_Data_Sheets_Appendix_A.xlsx · SHA-256 095185a833ac
  • Download PDF HEXANTA_WF1_RUN4_Equipment_Data_Sheets_Appendix_A.pdf · SHA-256 f857a156d17a

Native Revit schedule sheet M-5951 (P07)

NATIVE EXECUTED — not accepted (see the native review)P07Run 4

Source: wf1-NATIVE-REVIT-APS-GA-20261021-fc372ee3-SHEETS (manifest SHA-256 5cec23cf6176)

  • Download PDF WF1-HXA-ZZ-GF-DR-M-5951.pdf · SHA-256 f9cb25f3bc75
  • Download PNG WF1-HXA-ZZ-GF-DR-M-5951-P07-native.png · SHA-256 119f22209fff

Mechanical schedules (Stage 3) — Run 4

Change run — criteria revision 3 — RECORDED (verified evidence, not re-run)criteria revision 3Run 4

Source: run output documents/WF1_Stage3_Schedules.xlsx

  • Download XLSX WF1_Stage3_Schedules.xlsx · SHA-256 eeb97d6ebf62

Mechanical schedules (Stage 3) — Run 3

Baseline run — criteria revision 1 — RECORDED (verified evidence, not re-run)criteria revision 1Run 3

Source: run output documents/WF1_Stage3_Schedules.xlsx

  • Download XLSX WF1_Stage3_Schedules.xlsx · SHA-256 baf3d79b79ab

Preview

Choose “Preview sheets”, a sheet or “Preview PDF” above.