CALCULATIONS AND SCHEDULES

Calculations, schedules and BOQ

The current calculation package, equipment Required / Offered schedules and BOQ, with each run's own calculation workbook and schedules — by topic, with revision, source, native evidence status, previews and downloads.

P07 PROPOSED — not checked or approved by an engineer, not for construction

Checked by / approved by: NOT RECORDED — no verified engineer identity; nothing here is engineer approved or issued for construction.

PROPOSED — not checked or approved by an engineer, not for construction. Workbooks holding licensed CIBSE Guide C data stay local (named, with the reason); their review pages and every other workbook download here with their SHA-256.

Showing the documents for AHU-01 — its data sheet "M16 AHU-01" is open below.

Ventilation and air balance

Outdoor air, extract, AHU and FCU air quantities and coil duties

Calculation package (P07)

PROPOSED — not accepted, not checked, not approvedP07Run 4

Source: wf1-STAGE4-WORKBOOKS-FINAL-20261021-r2 (manifest SHA-256 08ce9ab12163)

  • HEXANTA_WF1_RUN4_Calculation_Package_LOCAL_ONLY.xlsx — local only: listed in the manifest but not present on this host SHA-256 944b2f121565
  • Download PDF HEXANTA_WF1_RUN4_Calculation_Package_REVIEW_PAGES.pdf · SHA-256 6439892b0dc7

Calculation workbook — Run 4

Change run — criteria revision 3 — RECORDED (verified evidence, not re-run)criteria revision 3Run 4

Source: run output workbook/HEXANTA_WF1_MECHANICAL_DESIGN_CALCULATIONS.xlsx

  • Download XLSX HEXANTA_WF1_MECHANICAL_DESIGN_CALCULATIONS.xlsx · SHA-256 3673258e2c71

Mechanical schedules (Stage 3) — Run 4

Change run — criteria revision 3 — RECORDED (verified evidence, not re-run)criteria revision 3Run 4

Source: run output documents/WF1_Stage3_Schedules.xlsx

  • Download XLSX WF1_Stage3_Schedules.xlsx · SHA-256 eeb97d6ebf62

Design criteria report — Run 4

Change run — criteria revision 3 — RECORDED (verified evidence, not re-run)criteria revision 3Run 4

Source: run output documents/WF1_Mechanical_Design_Criteria_Report.docx

  • Download DOCX WF1_Mechanical_Design_Criteria_Report.docx · SHA-256 c955db48888d

Calculation workbook — Run 3

Baseline run — criteria revision 1 — RECORDED (verified evidence, not re-run)criteria revision 1Run 3

Source: run output workbook/HEXANTA_WF1_MECHANICAL_DESIGN_CALCULATIONS.xlsx

  • Download XLSX HEXANTA_WF1_MECHANICAL_DESIGN_CALCULATIONS.xlsx · SHA-256 4d2d80a18d28

Mechanical schedules (Stage 3) — Run 3

Baseline run — criteria revision 1 — RECORDED (verified evidence, not re-run)criteria revision 1Run 3

Source: run output documents/WF1_Stage3_Schedules.xlsx

  • Download XLSX WF1_Stage3_Schedules.xlsx · SHA-256 baf3d79b79ab

Design criteria report — Run 3

Baseline run — criteria revision 1 — RECORDED (verified evidence, not re-run)criteria revision 1Run 3

Source: run output documents/WF1_Mechanical_Design_Criteria_Report.docx

  • Download DOCX WF1_Mechanical_Design_Criteria_Report.docx · SHA-256 15abf8acc667

Preview

Equipment data sheets — Appendix A (Required / Offered, P07) — HEXANTA_WF1_RUN4_Equipment_Data_Sheets_Appendix_A.xlsx

Loading preview…