Read-only demonstration. Four sanitised or hypothetical engineering projects. Each states its own validation status; nothing shown is engineer approved.
ENERGY & BUILDING-CODE COMPLIANCE · CASE STUDY
San Francisco Office Energy & Compliance — Simulations
NOT COMPLIANT / NOT ACCEPTED — native Title 24 runs rejected; official report not generated; ASHRAE PRM blocked
Simulations
Native steps
Step
Date
Status
Title 24 run 1: Standard model, Proposed + Standard annual simulations, Results Summary
2026-10-24
Executed; NOT ACCEPTED (D-CX-24); SUPERSEDED
Title 24 run 2 (corrected): same, regenerated Standard
2026-10-25
Executed; NOT ACCEPTED (D-CX-25, D-CX-28)
Battery step
2026-10-24 / 25
Run 1 FAILED; run 2 executed (after the Results Summary)
PV geometry / SARA
2026-10-25
BLOCKED (not automatable; operator needed)
Official report PRF-01
2026-10-25
NOT GENERATED (step disabled)
ASHRAE 90.1-2019 PRM
2026-10-24 / 25
Set-up only; BLOCKED by licence expiry 2026-10-25 02:40 GMT
Title 24 2025 run 1: annual simulation in progress (Standard design)Native IESVE Tasks window during the first Title 24 2025 annual simulation (2026-10-24), with 'Generate Standard Model' completed. Run 1 is SUPERSEDED and its 'complies' result was NOT ACCEPTED (D-CX-24). Cropped screenshot.Screenshot of the native tool (static image) · source: compliance-NATIVE-T24-RUN-20261024/shots/98-sims.png (cropped)Title 24 2025 navigator: annual simulation of Proposed and Standard designs (run 2)Native IESVE 2026 Title 24 2025 navigator during the corrected run 2: Proposed and Standard Design selected for the annual simulation; 'Generate Title 24 Compliance Report' (PRF-01) is greyed out. Cropped screenshot, not an interactive model. The run's software 'complies' result was NOT ACCEPTED (D-CX-25, D-CX-28).Screenshot of the native tool (static image) · source: compliance-NATIVE-T24-RUN2-20261025/shots/sim-dlg.png (cropped)Title 24 battery step inputs (run 2): code-minimum batteryNative IESVE Title 24 battery model inputs: 37.522 kWh usable, 9.381 kW charge/discharge, loss factor 0.0566, 12-month availability schedule. Manufacturer-neutral code-minimum battery (third-party battery data used only for the efficiency basis). The step ran after the Results Summary, which shows battery 0. Cropped screenshot.Screenshot of the native tool (static image) · source: compliance-NATIVE-T24-RUN2-20261025/shots/battery-inputs.png (cropped)PV panel tool (blocked step)Native IESVE free-standing PV panel dialog. Placing PV geometry could not be automated, so PV/SARA and the official compliance report remained BLOCKED. Cropped screenshot.Screenshot of the native tool (static image) · source: compliance-NATIVE-T24-RUN2-20261025/shots/pv-dlg.png (cropped)
Sanitised derivative of preserved evidence (compliance-* evidence folders, branch feat/compliance-engine). Nothing was re-simulated for this pack; IESVE was not started. Screenshots are cropped and reviewed; plots and the report contain only values read from the evidence. Not a compliance document. · Pack sf-office-compliance-r2 (built 2026-10-25); every file is checked against its SHA-256 before it is shown.