Read-only demonstration. Four sanitised or hypothetical engineering projects. Each states its own validation status; nothing shown is engineer approved.

ENERGY & BUILDING-CODE COMPLIANCE · CASE STUDY

San Francisco Office Energy & Compliance — Simulations

NOT COMPLIANT / NOT ACCEPTED — native Title 24 runs rejected; official report not generated; ASHRAE PRM blocked

Simulations

Native steps

StepDateStatus
Title 24 run 1: Standard model, Proposed + Standard annual simulations, Results Summary2026-10-24Executed; NOT ACCEPTED (D-CX-24); SUPERSEDED
Title 24 run 2 (corrected): same, regenerated Standard2026-10-25Executed; NOT ACCEPTED (D-CX-25, D-CX-28)
Battery step2026-10-24 / 25Run 1 FAILED; run 2 executed (after the Results Summary)
PV geometry / SARA2026-10-25BLOCKED (not automatable; operator needed)
Official report PRF-012026-10-25NOT GENERATED (step disabled)
ASHRAE 90.1-2019 PRM2026-10-24 / 25Set-up only; BLOCKED by licence expiry 2026-10-25 02:40 GMT

Sanitised derivative of preserved evidence (compliance-* evidence folders, branch feat/compliance-engine). Nothing was re-simulated for this pack; IESVE was not started. Screenshots are cropped and reviewed; plots and the report contain only values read from the evidence. Not a compliance document. · Pack sf-office-compliance-r2 (built 2026-10-25); every file is checked against its SHA-256 before it is shown.