ENERGY & BUILDING-CODE COMPLIANCE · CASE STUDY
San Francisco Office Energy & Compliance — Inputs
NOT COMPLIANT / NOT ACCEPTED — native Title 24 runs rejected; official report not generated; ASHRAE PRM blocked
Inputs
Building and site
- Building
- Synthetic WF1 London Run 4 office, single storey, 12 rooms; geometry unchanged (same geometry hash in London and SF)
- Areas
- 756 m² conditioned (8,137.52 ft²); 864 m² in the model incl. 108 m² unconditioned plantroom
- Site
- Hypothetical San Francisco site, provisional ZIP 94103; permit date assumed 2026-11-02
- Weather (offline)
- CEC CZ2022 climate-zone 3 file, Oakland station 724930 — named only, not shipped (licence not stated)
- Weather (native Title 24)
- CZ2025 Oakland file locked by the Title 24 mode (D-CX-21)
- Lighting
- WF1 design 9,864 W installed; Title 24 area-category allowance 5,480 W
CEC construction mapping (native U-values, W/m²K)
| Construction | WF1 U | CEC-mapped U | Change |
|---|---|---|---|
| External wall | 0.2613 | 0.2605 | −0.3 % |
| Roof | 0.1801 | 0.1782 | −1.1 % |
| Exposed floor | 0.2209 | 0.2223 | +0.6 % |
| Partition | 1.8568 | 1.8076 | −2.6 % |
Title 24 accepts only CEC library materials; the WF1 layers were mapped with insulation R preserved (D-CX-22, engineer review required). Glazing data are European values, not certified US ratings.

Sanitised derivative of preserved evidence (compliance-* evidence folders, branch feat/compliance-engine). Nothing was re-simulated for this pack; IESVE was not started. Screenshots are cropped and reviewed; plots and the report contain only values read from the evidence. Not a compliance document. · Pack sf-office-compliance-r2 (built 2026-10-25); every file is checked against its SHA-256 before it is shown.