ENERGY & BUILDING-CODE COMPLIANCE · CASE STUDY

San Francisco Office Energy & Compliance — Models

NOT COMPLIANT / NOT ACCEPTED — native Title 24 runs rejected; official report not generated; ASHRAE PRM blocked

Models

IESVE 2026 work copies of the WF1 Run 4 project located in San Francisco. The Title 24 navigator generated the Standard design from the ruleset. Run 1 used the wizard's library water-cooled chiller (not HP-01); run 2 used a code-minimum air-to-water heat pump BENCHMARK (cooling COPref 2.70, heating COPHref 2.31 at 47 °F; D-CX-26) — not the WF1 design heat pump HP-01, whose certified ratings are unresolved. The unserved plantroom was set to 'Unoccupied' in run 2 (D-CX-27).

Sanitised derivative of preserved evidence (compliance-* evidence folders, branch feat/compliance-engine). Nothing was re-simulated for this pack; IESVE was not started. Screenshots are cropped and reviewed; plots and the report contain only values read from the evidence. Not a compliance document. · Pack sf-office-compliance-r2 (built 2026-10-25); every file is checked against its SHA-256 before it is shown.